This new project Rose located at Guruvayur at an ideal spot around 150 mtrs from Private Bustand and 300 mtrs from East Nada of Sree Krishna Temple - the famous pilgrim destination of Hindu Devotees. Rose Apartments is a G+4 project comprising 24 flats in total with Studio, 1 BHK & 2 BHK apartments to select as per your requirements. Basement floor has been allocated exclusively for car parking purpose. Here in Rose Apartments, where luxury meets affordability, entirely satisfying your likings, offer all world class amenities and convieniences beyond your expectations. Newline Builders standing for quality and perfection guarantees full value for hard earned investment.

Elegantly designed visitors lounge

Fully equipped
health club

Ample basement car parking

Children’s play area

High speed lift

Water treatment plant

Driver’s room & restroom facility

Round the clock security with intercom assistance

Generator back up for lift, common area & flats with limited load capacity

Structure :- G+4 R.C.C. framed structure with solid block masonry plastered with rich cement mortar.

Flooring :- Premium quality vitrified tiles for entire apartments including baconies & work area.

Kitchen :- Kitchen counter with well polished black granite top and stainle steel single bowl sink with drain board. Glazed designer wall tile over the counter to a height of 60cm.Water purifier & electric

Toilets :- Superior quality anti skid ceramic tiles for flooring. Beautiful designer wall tiles up to 7ft height. Exquisite high quality branded EWC with health faucets. Concealed piping and premium quality CP fittings. Half pedestal wash basin. Provision for mirror light geyser & exhaust fan.

Doors And Windows :- Teak finished hard wood frame for entrance door. Flush doors for bedrooms and water resistant flush doors for toilet. Rich powder coated aluminum sliding windows with branded glazed glass.

Painting :- Putty and plastic emulsion for internal walls and ceiling. Superior weather proof emulsion for external walls.

Electrical :- oncealed conduit wiring with copper conductor, adequate light and fan points 6/16amps socket points etc.controlled by ELCB and MCBs with independent KSEB meters. Contemporary modular switches & sockets. A/C provision in master bedroom.

Lifts :- One high speed passenger lift with DG back up.

Cable TV & Telephone :- Cable TV & Telephone point in living room and master bedroom. Intercom facility.

Fire Fighting :- Fire fighting arrangements as per NBC norms.

Generator :- Generator back up for common facilities such as lifts common lighting, pumps etc.Generator back up for all apartments with limited load capacity.

1. Once Alloted the agreement is to be signed within 20 days. Otherwise the builder has the right to cancel the booking.

2. At the time of executing the agreement the amount due as per the work stage has to be paid and balance payment should be paid as per the payment schedule

3. The purchaser is bound to obey the rules and regulations as per the by laws of the association formed in a later stage.

4. All dimensions given in the plans are not to scale. Furniture layout is only an indication for space utilization. The elevation shown in the brochure is an artistic impression only and the actuals may vary according to the practical site conditions

5. The brochure does not constitutes a legal offer.

6. Any disputes are subject to Chavakkad jurisdiction only.

7. Newline Builders & Developers reserve the right to accept or reject any claim

1 At the time of Booking 1 Lakh

2 On completion of foundation 15 %

3 On completion of Ground Floor Slab 10 %

4 On completion of First Floor Slab 10 %

5 On completion of Second Floor Slab 10 %

6 On completion of Third Floor Slab 10 %

7 On completion of Fourth Floor Slab 10 %

8 On completion of brick work and plastering 8 %

9 At the time of Handing over remaining 2 %